Thursday 26th July 2012 A dull start. |
Finish the door frames and hang the doors.
Put on the timber base-rail
Insert 72 (non) self-drilling screws
Install irrigation system
Cover hoops with hotspot tape
These are the jobs which need doing before the cover can go on. The pressure is really on. I've learned that the sheer scale of this polytunnel means that, even if things go well and I work like a dog, each stage takes a good few hours.
The forecast is becoming a bit more dodgy - a North / South split with fresher weather on it's way. Fingers crossed we get the weather of the South.
Doors hung. A long job, but worth doing properly. |
View from afar. It's a large polytunnel, but I'm happy that the scale fits in with everything else. |